Bill of materials (BOM)
A bill of materials, or BOM, is the list of every material and part that goes into one finished piece, with the amount of each.
What is on it for a garment.
| Item | What to specify |
|---|---|
| Main fabric | Fiber content, knit or weave, weight in GSM, color, amount per piece |
| Secondary fabrics | The same, plus where each one goes |
| Thread | Type and color |
| Trims | Elastic, drawcords, buttons, zippers, with sizes |
| Labels | Brand, size, care and content |
| Packaging | Bag, sticker, hangtag |
Why it exists. It is how a garment gets a cost and how materials get ordered. Multiply each line by its price and you have the material cost of one piece. Multiply by the order quantity and you have what to buy.
Consumption. The fabric line carries the amount used per piece, which the factory works out from the pattern layout. It differs by size, so a BOM costed on a medium comes up short on an order that is mostly 2XL. Add an allowance for waste and for remakes.
Where it lives. In the tech pack, as one of its main sections. The measurement chart says how big the garment is. The BOM says what it is made of.
Where it goes wrong. Vague lines. "Polyester mesh" is not a specification. A factory fills a gap with whatever is cheapest or closest to hand, and you have no grounds to complain. A reorder made from a vague BOM comes back in a different fabric.
For decorated blanks. The BOM is short: the blank, the ink or transfer, and the packaging. It is still worth writing down, because it is the material cost of the job.
Updated .
