Skip to content

CMT (cut, make, trim)

CMT, short for cut, make, trim, is a way of buying production in which the buyer supplies the fabric and the factory charges only for cutting it, sewing the garments and finishing them.

What the three words cover. Cut is spreading the fabric and cutting the panels. Make is sewing. Trim is read two ways. In some factories it means the factory supplies thread, labels and other trims. In others it means trimming thread ends, pressing and packing. Ask which one the quote means and get the answer in writing.

CMT and full package. The other way to buy is full package. The factory buys the fabric and trims, makes the garment and quotes one price per piece. CMT gives the buyer control of the fabric and what it costs. It also gives the buyer the work of ordering the fabric, paying for it and getting it to the factory on time.

What the price leaves out. Fabric, the freight to deliver it, and often patterns, grading and decoration. A CMT price is not the cost of the garment. Add the rest before comparing it with a full-package quote.

Who carries the risk. Under CMT, fabric problems belong to the buyer. If a roll arrives late, short or off shade, the line waits and the delivery date moves. Agree before production how much fabric each piece may use and what happens to the fabric left over.

On a team order. A shop that prints its own sublimated fabric can send the printed rolls to a sewing contractor on CMT terms. The contractor quotes a price per jersey for cutting and sewing. The shop keeps control of the print, and it pays for any panel it printed wrong.

Related: cut and sew, landed cost, purchase order.

Updated .

All glossary terms